Geology Building, Engineering Building and portion of sidewalk closing over fall break

A portion of the sidewalk south of the Engineering Building will be closed from the evening of Friday, Oct. 9 through Tuesday, Oct. 13 to install a hydronic line.

In addition, power to both the Geology Building and Engineering Building will be shut down Oct. 12-13 for the replacement of a breaker panel.

To minimize disruption to campus operations, all work is scheduled to be completed during fall break.